AIM – Application Implementation Methodology developed by Oracle Corporation
Migration Document is two types
1) Installation Process: Installation Stages are three types.
Those are:
If any of the form or report is developed, when it is moving from one instance to another instance, to be moved all the components of that. Example functions, procedure, packages etc. This process will be done by DBA.
2) Execution Process: In this the execution of the form or report with a screen shoot to be specified along with the functionality
CR Document:
The document tell about the request made by the client, it could be very small change like single filed to be added or deleted to the form or procedure to be deleted.
R I C E
|
Number
|
Name
|
Prepared by
|
Module
Design
Forms
& Reports
|
MDO
50
|
Functional
Design Document
|
Functional
Consultant
|
MDO
70
|
Technical
Design Document
|
Technical
Consultant
|
|
MDO120
|
Migration
Document
|
Technical
Consultant
|
|
Conversions
Interface
|
CVO40
|
Conversion
functional Design Document
|
Functional
Consultant
|
CVO
60
|
Conversion
Technical Design Document
|
Technical
Consultant
|
|
Support
|
CR
Document
|
Change
Request
|
Technical
Consultant
|
Migration Document is two types
1) Installation Process: Installation Stages are three types.
Those are:
- development
- testing
- production
If any of the form or report is developed, when it is moving from one instance to another instance, to be moved all the components of that. Example functions, procedure, packages etc. This process will be done by DBA.
2) Execution Process: In this the execution of the form or report with a screen shoot to be specified along with the functionality
CR Document:
The document tell about the request made by the client, it could be very small change like single filed to be added or deleted to the form or procedure to be deleted.